Stay up-to-date on the I-64 High Rise Corridor Study and future plans for bridge replacement by visiting the project website.
Facts
Located on Interstate 64- Crosses the Southern Branch of the Elizabeth River
- Twin bascule span, four-lane bridge operated by the Virginia Department of Transportation
- Constructed in 1972
Daily Vehicle Traffic: 85,600
Height (At Mean High Tide): 65 feet
Weight Limits: Legal Load
Bridge Schedule: Opens on demand with 24-hour notice except during restricted periods, when it opens with a 3-day advance reservation.
Restricted Periods: 6 to 9 a.m. and 3 to 6 p.m.