Project Description:
This project funds the construction of a sidewalk along Myers Road to connect pedestrians from the Atlantic Ave to Lyons Ave. The sidewalk will be constructed along both sides of Myers Road beginning at Atlantic Ave and will tie into the existing sidewalk at Lyons Ave. The project will also include the construction of curb and gutter and storm drainage pipe along both Myers Road and will include pedestrian curb ramps at the intersections.
Project Schedule:
TBD
Project Budget:
Budget: $1.44 million