-
-
- City Activities and Info
-
- Resources for New and Relocating Businesses
- Development, Land Use & Construction
- Resources
- Doing Business with the City
-
- City Budget
- Constitutional Offices
-
- Property Information
- Public Safety
- Construction
St. Julian Creek
| Phone: 757-382-6101 | Fax: 757-382-8537 | Email: sawan@cityofchesapeake.net |
| Senior Stormwater Engineer: Sam Sawan | ||
Entire study pdf
(90 pages - 15.3mb) - print quality
NOTE: All documents are in Adobe
PDF format
and will open in a new browser window.
Table of Contents
- Executive Summary
- Introduction
- Watershed Issues & Background
- Computer Modeling
- 4.1 Data Sources & Processing
4.2.1 Rainfall Hyetographs
4.2.2 Subarea Delineation
4.2.3 Subcatchment Imperviousness, Roughness & Depression Storage
4.2.4 Subcatchment Basins
4.2.5 Green-Ampt Soils Parameters
4.2.6 Drainage Network Discretization (Links and Nodes)
4.2.7 Open Channel Approximations
4.2.8 Important Considerations and Implications Regarding Boundary Conditions and Return Periods
4.2 Model Development & Selection Development & Selection of Parameters- Modeling Scenarios & Computer Files
5.1 Vertical Datum
5.2 Existing (2004) Conditions Models
5.3 Future Conditions Models- Modeling Results
6.1 Existing (2004) Conditions Maximum Water Surface Elevations
6.2 Future Conditions Maximum Water Surface Elevations- Master Drainage Plan Improvements
7.1 Camelot Lake Bypass
7.2 Portsmouth Outfall -- Gust Lane to Deep Creek Boulevard
7.3 Portsmouth Outfall -- West of U.S. 17Appendix A.

