-
-
- City Activities and Info
-
- Resources for New and Relocating Businesses
- Development, Land Use & Construction
- Resources
- Doing Business with the City
-
- City Budget
- Constitutional Offices
-
- Property Information
- Public Safety
- Construction
Milldam Creek
| Phone: 757-382-6101 | Fax: 757-382-8537 | Email: sawan@cityofchesapeake.net |
| Senior Stormwater Engineer: Sam Sawan | ||
Entire study pdf
(90 pages - 284 MB) - print quality
Entire study pdf
(90 pages - 142 MB) - viewing quality
NOTE: All documents are in Adobe
PDF format
and will open in a new browser window.
Table of Contents
-
- Executive Summary
- Introduction
- Watershed Issues & Background
- Computer Modeling (entire Section #4- 16 pages - 141.4 MB)
- 4.1 Data Sources & Processing
- 4.2 Methodology
- 4.3 Model Development & Selection of Parameters
-
4.3.1 SWMM RUNOFF & EXTRAN Blocks
4.3.15 Important Considerations and Implications Regarding Boundary Conditions and Return Periods
4.3.2 SWMM Engine, Numerical Solutions, Time Steps
4.3.3 Rainfall Hyetographs
4.3.4 Subarea Delineation
4.3.5 Subcatchment Width
4.3.6 Subcatchment Slope
4.3.7 Subcatchment Imperviousness, Roughness & Depression Storage
4.3.8 Subcatchment Basins
4.3.9 Green-Ampt Soils Parameters
4.3.10 Drainage Network Discretization (Links and Nodes)
4.3.11 Missing Pipe & Channel Data
4.3.12 Treatment of EXTRAN Flooding
4.3.13 Channel Roughness
4.3.14 Outfall Boundary Conditions - 4.4 Figure 4.4 -
- 4.5 Figure 4.5 -
- 4.6 Figure 4.6 -
- Modeling Scenarios & Computer Files
- 5.1 Vertical Datum
- 5.2 Existing (2003) Conditions Models
- 5.3 Future Conditions Models
- Modeling Results
- 6.1 Existing (2003) Conditions Maximum Water Surface Elevations
- 6.2 Future Conditions Maximum Water Surface Elevations
- Master Drainage Plan Improvements
- 7.1 New 32-Foot Bridge at Campostella Road
- 7.2 Widen Channel to 40 Feet Between Campostella Road and Military Highway
- 7.3 New 6x6 Box Culvert at Military Highway
- 7.4 New Stormwater Management Basins East of Battlefield Boulevard
-
B.1 Introduction
- B.2.1 Pro Rata Share Calculations Based on a Billing Unit
B.2.2 Pro Rata Share Calculations Based on Actual Measurement of All Parcels
B.2.3 Pro Rata Share Calculations Using Rational Coefficients
B.2.4 Pro Rata Share Based on a Flat Rate
B.2.5 Summary of Calculation Methods
B.2 Pro Rata Share Calculations Options
B.4 Recommended Improvements inthe Milldam Creek Watershed
Appendix A. Subcatchment Imperviousness & Soil Parameters
Appendix B. Pro-Rata Share Program Evaluation

